Two drill rigs have been mobilized to begin an 8,000-metre drill program in the Cameron and Florence sectors of the Kinebik Project
TSXV:OIII | OTCQX:OIIIF – O3 Mining
Read more at newswire.caProvided Content: Content provided by Newswire.ca. The Globe and Mail was not involved, and material was not reviewed prior to publication.