Skip to main content
hello world

Provided Content: Content provided by Newswire.ca. The Globe and Mail was not involved, and material was not reviewed prior to publication.

Lumina Gold Announces Filing of NI 43-101 Pre-Feasibility Study Technical Report

Newswire.ca - Thu Jun 1, 2023

VANCOUVER, BC, June 1, 2023 /CNW/ - Lumina Gold Corp. (TSXV: LUM) (OTCQX: LMGDF) (the "Company" or "Lumina") is pleased to announce that the Company has filed on SEDAR an independent technical report (the "Report") prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("NI 43-101") supporting the results of a Pre-Feasibility Study ("PFS") for the development of its Cangrejos gold-copper project located in southwest, Ecuador (the "Project" or "Cangrejos"). The results of the PFS were previously reported in the Company's news release dated April 17, 2023, and there are no material differences in the Report from those results. The effective date of the Report is April 7, 2023.

Read more at newswire.ca