Announced additional results from the 2024 drilling program. Twenty-seven holes have been completed, with two more currently in progress. The 2024 drill program is strategically targeting the western extension for potential additional expansion ahead of the commencement of a pre-feasibility study. The drilling has been systematically testing the expansion of the west zone, with some holes drilled to the north to delineate mineralization boundaries on the west side (GS2404, GS2409, GS2410). Hole GS2403 was drilled to the northwest and did not reach the target depth. Freegold Ventures Limited shares T.FVL are trading up $0.05 at $1.09.